多选题:Ravi like many project (71) had studied the waterfall mode

  • 题目分类:IT认证
  • 题目类型:多选题
  • 查看权限:VIP
题目内容:

Ravi, like many project (71) ,had studied the waterfall model of software development as the primary software life-cycle (72) .He was all set to use it for an upcoming project, his first assignment. However, Ravi found that the waterfall model could not be used because the customer wanted the software delivered in stages, something that implied that the system had to be delivered and built in (73) and not as (74) .The situation in many other projects is not very different. The real world rarely presents aproblem in which a standard process, or the process used in a previous project, is the best

choice. To be the most suitable, an existing process must be (75) to the new problem.Adevelopment process, even after tailoring, generally cannot handle change requests. Toaccommodate change requests without losing control of the project, you must supplement the development process with a requirement change management process.

(71) A. customers B.managers C.users D. administrators

(72) A. activity B.procedure C.process D. progress

(73) A.parts B.modules C.software D.a whole

(74) A.parts B.modules C.software D.a whole

(75) A.modified B.used C.suited D. tailored

参考答案:

UML 中关联的多重度是指 (42) 。 (42) A.一个类中被另一个类调用的方法个数 B.一个类的某个方法

UML 中关联的多重度是指 (42) 。(42)A.一个类中被另一个类调用的方法个数B.一个类的某个方法被另一个类调用的次数C.一个类的实例能够与另一个类的多少个实例相关联D.两个类所具有的相同的方法和

查看答案

发现车辆发生交通事故后逃逸的,你应当:()

发现车辆发生交通事故后逃逸的,你应当:()A、尽量记住车辆的号牌、车身颜色、车辆型号、车辆用途,逃逸方向等情况,并立即报警B、自行追赶肇事车辆C、在无急救知识的情况下自行抢救受伤人员D、赶快离开现场以免

查看答案

在变更控制工作程序中 应在(59)时提交工程变更建议书。(59)A.了解变化 B.接受变更申请C.变更的

在变更控制工作程序中,应在(59)时提交工程变更建议书。(59)A.了解变化B.接受变更申请C.变更的初审D.变更分析

查看答案

第 117 题 全体发起人的货币出资金额不得低于公司注册资本的20%。

第 117 题 全体发起人的货币出资金额不得低于公司注册资本的20%。()A.正确B.错误

查看答案

下列有关施工预算和施工图预算的说法,正确的是()。

下列有关施工预算和施工图预算的说法,正确的是()。

查看答案