选择题:3.The meeting’s been canceled. Ann () all that wor

题目内容:
3.
The meeting’s been canceled. Ann () all that work.
(A) need to do
(B) need have
(C) need’t have done
(D) needed not to do
参考答案:

13.FIDIC《施工合同条件》的“缺陷通知期”,是指( )。A.工程保修期B.承包商的施工期C.工

13.FIDIC《施工合同条件》的“缺陷通知期”,是指( )。A.工程保修期B.承包商的施工期C.工程师在施工过程中发出改正质量缺陷通知的时限D.工程师在施工过

查看答案