选择题:● During the project, requirements change for a variety of reasons. As needs cha

  • 题目分类:软考高级
  • 题目类型:选择题
  • 查看权限:VIP
题目内容:

● During the project, requirements change for a variety of reasons. As needs change and as work proceeds, additional requirements are derived and changes may have to be made to the existing requirements. It is essential to manage these additions and changes efficiently and effectively. To effectively analyze the impact of the changes, it is necessary that the source of each requirement is known and the rationale for any change is documented. The project manager may, however, want to track appropriate measures of requirements volatility to judge whether new or revised (75)are necessary.

(75)

A. proceedings

B. controls

C. forecasting’s

D. prelibations

参考答案:

● 某个大型电力系统项目的一个关键团队成员已经出现进度延误的迹象并且工作质量也开始出问题。项

● 某个大型电力系统项目的一个关键团队成员已经出现进度延误的迹象并且工作质量也开始出问题。项目经理相信该成员非常清楚工作的最终期限和质量规范要求。项目经理应采取的措施是(46) 。(46)A. 把问题报

查看答案

● 为了让客户对项目团队提供的软件产品的功能满意,项目经理让客户在一份文档上签字以便确认,这份

● 为了让客户对项目团队提供的软件产品的功能满意,项目经理让客户在一份文档上签字以便确认,这份文档是(59) 。(59)A.技术规范B.测试规范C.用户手册D.质量保证计划

查看答案

● 许多黑客利用缓冲区溢出漏洞进行攻击,对于这一威胁,最可靠的解决方案是(7) 。 (7)

● 许多黑客利用缓冲区溢出漏洞进行攻击,对于这一威胁,最可靠的解决方案是(7) 。(7)A. 安装防火墙B. 安装用户认证系统C. 安装相关的系统补丁软件D. 安装防病毒软件

查看答案

人类活动的类型按功能来划分,可分为()

A.直觉活动(审美活动)B.认知判断活动C.道德活动D.生产(经济)活动

查看答案

该企业现在必须投资( )万元。

初级会计实务•单选题甲企业期望某一对外投资项目的预计投资利润率为10%,投资后每年年底能得到50万元的收益,并要求在第2年年底能收回全部投资,则该企业现在必须投资( )万元。(已知年利率为10%时,2年

查看答案